Cleveland-Cliffs has completed the erection of a 457ft furnace reactor tower in Toledo, Ohio. The crane, which is reported to be one of the largest construction cranes in North America, has a 3,000t lifting capacity. The crane is planned to be disassembled this month. READ MORE
Oct
01
Comments are closed.