Damaged tools & equipment Overhead power lines Inadequate wiring Impropre grounding Exposed electrical parts
2012- The Peace Bridge, a pedestrian bridge in Calgary, Canada, opens.
PPE for asbestos removal, to reduce exposure to skin, must meet the following criteria: Tightly covers body and body Foot covers (preferably without laces) Resistant to penetration by asbestos fibres... read more →
2005- Steve Fossett completes the first non-stop solo flight around the world without stopping to re-fuel.
Section off construction zones Keep the client informed of daily progress Set a construction schedule daily hours Minimize creation of dust inside the home
The table saw is at the heart of most shops, and with 42% of the 720,000 woodworking injuries that happen each year involving a table saw, it’s necessary to know... read more →
Step 1 Log in to your Hard Hat Hunter account. Step 2 Select forum from the top left hand corner. Step 3 Set a forum name. Step 4 Join a... read more →
1893- The first federal railroad legislation is passed
Guards must always be secured to the machine Never remove, alter, or by-pass safety guards Always use lock out/tag out procedures when guards are removed to be repaired or replaced.... read more →
What is a Working at Heights Rescue Plan? A working at heights rescue plan is a template that once filled out, contains all information necessary to smooth out the response... read more →