The railway bridge, which is more than 100 years old, had reached the end of its service life and needed to be replaced. In addition to the steel framework’s dimensions (70m long, 7m wide, 8m high and 350t), the confined spatial conditions proved to be a particular challenge for everyone involved READ HERE
Jan
31
Comments are closed.